From: route@monster.com
Sent: Friday, April 15, 2016 10:29 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
ALEXANDER
MILLABUTE ATANACIO
OSP Design and Wireless Field Engineer
141
Lucy Lane,San Ramon, CA
Mobile (925)
321-4998
Email: alex_atanacio719@yahoo.com
plm.bsee7580@gmail.com QUALIFICATIONS Earned
years of experience in the field of Telecommunications, specializing in
project management
of outside plant planning and design for OSP, construction control, quantity surveying
and consultancy. And also gained knowledge of Field Engineering/technician works
on wireless Radio Base Station (RBS) & cell site equipments for Ericsson,
Alcatel-Lucent,
Samsung and Huawei (Clearwire). I have undergone training in computer
aided designs as Auto CAD and ARES (Automated Records and Engineering System)
of AT&T and also certified RT2/RTU2 , CBU-DUW certified by Ericsson. Have
knowledge and experienced
working for different Wireless Telecom Carriers (AT&T, TMobile, Verizon &
Sprint) on their specific projects. I am a self-motivated, hardworking
individual who enjoys
a self-challenging profession. EDUCATION AND CERTIFICATIONS Pamantasan Ng Lungsod Ng Maynila (University of City of Manila) – Manila,
Philippines Bachelor of Science in Electrical Engineering Professional Regulation Commission-Philippines Licensed Electrical Engineer AT&T - San Ramon, CA Certified ARES and JAM for OSP Engineering Design EXI-Parson Certified in RT1 and RT2 AT&T CBU-DUW
Modernization Course Completed DUL-DUS
work experience PROFESSIONAL
EXPERIENCE Ericsson – Northern California 9/2014
to 7/2015 (Contracted through Orin Staffing Solutions) RBS Field Technician · T-Mobile
Projects- T-Mobile Harvest (Metro PCS) and DUL to DUS Migration Project · Log
in to the NOC, Ericsson and NIC · Prepared
Pre photos and Elements Manager screenshot on Equipment,Radio
Network,IP,Product name,Upgrade and Back up the Alarms · Wait
for NIC support advised that the site is already “Locked” · Remove
the DUL equipment and replace by DUS equipment · Re-install
cables and fibers · Scratch
reload and install the necessary Software the“Upgrade Package” (R36AC or
R41CC) and the CV ( created by the NIC) · Advise
the NIC after completion of activities when all cables and fibers are already
working to “Unlock” the site · Prepare
the necessary Post checking Verizon– Northern California 5/2014
to 8/2014 (Contracted through LCC International) RBS Field Technician · Data
Test drive · Gathered
RF data for Verizon for VoLTE projects · Verified
all sectors cellsite anntenas surrounding a venue (airports/military bases)
by loop surveying with the aid of the ANRITSU SPECTRUM MASTER(MS2724C
Spectrum Analyzer 9khz-20GHz) · Performed
drive testing of CDMA 3G cellsites, 4G cellsites and gathering of data and
information cellsite signal strength, handover and drop calls, and other data
related to measuring KPIs (Key perfromance Indicators), utilizing Samsung
test phones, scanners, and testing software (Qualcomm’s QPST, XCAL, DU meter)
Sprint– Pacific Northwest 4/2014
to 5/2014 (Contracted through LCC International) RBS Field Technician · Data
Test drive · Gathered
RF data for Sprint 2.5 GHz LTE survey projects in all assigned Airports and
Military bases · Verifying
all sectors cellsite anntenas surrounding a venue (airports/military bases)
by loop surveying with the aid of the Anritsu Spectrum Master (MS2724C
Spectrum Analyzer 9khz-20GHz) · Performed
drive testing of CDMA 3G cellsites, 4G cellsites and gathering of data and
information cellsite signal strength, handover and drop calls, and other data
related to measuring KPIs (Key perfromance Indicators), utilizing Samsung
test phones, scanners, and testing software (Qualcomm’s QPST, XCAL, DU meter)
AT&T –Northern California 5/2013
to 12/2013 (Contracted through Quadgen Wireless Solutions) RBS Field Engineer · Data
Test drive · Gathered
RF data for AT&T (UMTS and LTE)Projects with the use of the AGILENT,TEMS
and NEMO Softwares (checked the assigned frequencies ies;
F1-4385,F2-487,F3-512,F4-4360,F5-537) verifying the assigned Scrambling
Codes, Through puts, checked the scanner status and so with the
connectivities of the necessary UE’s (Ericsson/Samsung TEMS) · Verified
that the phones are doing calls on Short MO, Long MO,HSDPA & HSUPA · Test
Drive for every site assignment Ericsson – Northern California 8/2012
to 4/2013 (Conracted through Atlas Wireless and Telecom) RBS Field Engineer · T-Mobile
Modernization Project with Ericsson FSO · Installation/Commission
RAX and TX boards · DUW30
Installation, commissioning and Integration · Installed
and commission GPS antenna Sprint– Northern California 7/2012
to 8/2012 (Contracted through Global Technology Associates)
RBS Field Engineer · DU
and CSR script Loading and commissioning · M1
TDM T1 migration/CSR insertion in Sprint radio base equipments, including
cat5e-cabling, verifying and connecting live copper T1s in telco 66 blocks,
clearing of alarms, call and speed testing, 3G & 4G Fiber migration and
integration, NV (Network Vision) project AT&T – Bay Area, CA 11/2010
to 7/2012 (Contracted through Managed Staffing/United
Commtel) RBS Field Engineer · Performed
C.O.P.(Close Out Package) for all completed assignements on 4C integrations
and ETMFX Projects acquired for final submission with the client-Ericsson for
billing purposes · Power
Conversion –UMTS/GSM DC Filter PSU changeout · 2
X UMTS powered on -48v and 3 X GSM powered on +24v · ETMFX
delivery and installation/load Siad script/slide SFP cards/terminate cables
from router to dual node B and fiber Ciena/PCO testing · Installed
ETMFX boards in 1C/3C RBS cabinets · Removed
ETH cable from CBU and terminate to port D of ETMFX, install Bus cable from
CBU Ethernet port to ETMFX port B (1C only) · Checked
and performed correction for incorrect CAT5 cable assignments · Terminated
SIAD CAT5 cables from Cisco router to dual Node B · Slid
SFP cards in Cisco router · Terminated
the fiber cable from Ciena to SIAD, and performed dispatch and
troubleshooting · PRE/POST
sweep test using ANRITSU · AT&T
/ Ericsson Project; 2c/3c/4c UMTS/RBS 3206/3106/3518/3418/RRU/RRUW · 4C
850 kit delivery and installation (3RU’s, 3FU’s, 1PSU, RAX and TX boards) · Install
co-siting cables and fabricate new RF jumpers for 4C · Performed
2nd and 4th Carrier Adds/Integration (install co-siting cables; swing or
install jumpers; load sector-add and PSU scripts) · Loaded
external hardware, OAM and Site Complete scripts during 3C cut-over from
RBS3518 to 3206/3106 · Conducted
functional test (call and data) and PSAP SIM/E911using TEMS · Call
Testing for– PSAP Live Test(911), Simulation, and Basic Call Testing (Voice
and Data) · Performed
corrective maintenance/troubleshooting in case of alarms and downtime · Replaced
faulty units (RUs, FUs, data and power cables, RAX and TX boards, etc.) · Swapped
units during fault isolation · Performed
T1 adds and connectivity troubleshooting · Resolved
RSSI/ VSWR problems on antenna lines · Conducted
antenna system sweep tests on old and new jumper-feeder lines using site
master · Conducted
spectrum analyzer sweep tests in cases of frequency interference · Submitted
daily field reports, integration reports, pre/post screenshots and site
photos; serial nos. and asset tags for COPs · Performed
troubleshooting hardware faults and undertake complete RBS integration to RNC
· Re-rooming
of the cellsites/GSM harvest in AT&T cellsites · Coordinated
with helpdesk for log-in and log-out of a certain cellsites and the Trouble
ticket numbers · Saved
IDB coordinates with the assign switch technician · Re-installed
antenna (RF cables),radio unit re-configurations,T1 re-terminations and
coordinates with assigned switch technician · RT
2 Certified EXI Parson · T1
Tested Node B T1 add installation/expansion project · Cabling
and configures Node B by element manager tool · Site
survey for UMTS 3106/3206 Node B proposed expansion sites · Installed
Node B cabinets (3106 and 3206) · Performed
LOS (Line Of Sites)survey under Clearwire Corporation in Salt Lake City, Utah
projects · Verified
tower heights by the use of range finder · Locate
the latitude and longtitude of the tower by the use of GPS · Report
the actual field condition per site link of the proposed additional microwave
antenna locations · Took
pictures of the assigned sites (180 degrees ) for obstruction justification
on the assigned links AT&T – Bay Area, CA 10/2010
to 11/2010 (Contracted through James Services) RBS Field Engineer · Same
role as previous assignment AT&T – Bay Area, CA 4/2010
to 9/2010 (Contracted through Atlas Wireless and Telecom) RBS Field Engineer · Same
role as previous assignment AT&T – San Ramon, CA 11/2008
to 9/2009 (Contracted through Inpro – Solution LLC) OSP Sr. Engineer / Telecom Engineer · Reviewed
Network Engineering work plans for special cases · Calculated
Project cost/man-hours prior to Bidding/Quotation preparations · Performed
engineering, survey and design for FTTP and F2 conditioning jobs · Proposed
appropriate fix lugs Terminals to replace RA Terminals, located missing
Terminals, and performed Cable Bridge Taps · Prepared
FEI and checked the “Pair Bonding Zone” of a certain SAI by the aid of SLI
for “P-Commits”, “S-Commits” and “T-Commits” after checking each pair from
“LFACS” · Certified
ARES and JAM user by AT&T AT&T – San Ramon, California 10/2007
to 11/2008 (Contracted through Versacom LLC) OSP Sr. Engineer / Telecom Engineer · Reviewed
Network Engineering work plans for special cases · Calculated
Project cost/man-hours prior to Bidding/Quotation preparations · Performed
engineering, survey and design for FTTP and F2 conditioning jobs · Proposed
appropriate fix lugs Terminals to replace RA Terminals, located missing
Terminals, and performed Cable Bridge Taps · Prepared
FEI and checked the “Pair Bonding Zone” of a certain SAI by the aid of SLI
for “P-Commits”, “S-Commits” and “T-Commits” after checking each pair from
“LFACS” Mostcom Philippines Enterprise, Inc – Pasig City,
Philippines 4/2005 to 9/2007 Sr. Project Engineer (Outside Plant) · Reviewed
Network Engineering work plans for special cases and calculates Project
cost/man-hours prior to Bidding/Quotation preparations · Perform
preliminary surveys for post TEP job and update plans, working lines, DP's being
installed · Forecasting
and Planning, Outside Plan Fundamental Plan, Detail Design - Cable Network
(primary and secondary), Manhole and Conduits, Broadband Projects including · Responsible
for Civil and Electrical works for Global System Mobile (GSM) projects.
Including training of Engineers and Surveyors · Lead
in the negotiation and closed deal with the biggest broadband service company
for Outside Plan projects for 3rd Generation worth for US 25 million Alcatel Philippines, INC. – Makati City, Philippines
01/1993 to 01/2005 Sr. OSP Engineer · Head
of As-built Engineering / Design projects · Supervised
17 engineers and surveyors · Performed
Engineering Planning and Design for Outside Plant projects. · Responsible
for coordination, investigation, verification with contracting companies
on Outside Plant projects including documentation for civil and
electrical works for GSM projects Completed design links for 37
Philippine Long Distance Telephone (PLDT) inter-Office Trunking (IOT Trunking
link) projects. October 1991 to December 1992 Lead Engineer/Planner TELEPLAN PHILIPPINES, INC. : Makati
City, Philippines MANAGEMENT SCIENCES OF UNITED KINGDOM
(MSUK) - BRUNEI, DARUSSALAM §
Mapping, planning, and samplings on telephone requirements
for forecasting, detail design (civil works, primary and secondary cable,
manhole and conduits, residential houses, commercial private and
government establishments §
Supervise
and provide training support, task assignment and coordination in order to
maximize the Production of the team in the specified corporate direction.
Prepares manhole and conduit design and the As-built redline drawings of the
completed projects. August 1987 to October 1991 Planner (Outside Plant
Engineer) ELECTRONIC TEL. SYSTEM INDUSTRIES INC.
- MANDALUYONG CITY, PHIL. HOUSSAM COMMERCIAL EST. (Saudi
Telecom) - RIYADH, KSA §
Review
Network Engineering work plans for special cases to ensure that standards are
met. §
Preliminary
surveys for post TEP job and update plans, working lines, DP's being
installed. §
Planning
and design, final survey for the size and number of cable pair, Prepares NESP
(Network Estimating and Scheduling Program) for the Post TEP, material
detailing, updating of plant design §
Perform
Buried Service Wire and Post Telephone Expansion Program (TEP) job, Conduct
field survey works, analyze, design perform engineering drafting under close
supervision. March 1985 to July 1987 Quantity Surveyor/Facility
Assigner NATIONAL TELEPHONE SERVICES
- MUSCAT, SULTANATE of OMAN Measure and Check plans
needed for survey on the ongoing new telephone project. §
Prepare Diary and Bill of Quantity
(BOQ), red lines for primary and secondary schematic plans. §
Coordinate
and assist all site engineers in obtaining correct routing
and
assignment. §
Generate
and analyse discrepancy reports thru Site Engineers findings. May 1982 to December 1984 Control Engineer SAUDI
TELEPHONE
- RIYADH, KSA §
Check
plans such as Buried Cable, Underground Cable, Aerial Cable and BSW §
Perform
utilization of every project handled by Outside Plant Engineer. §
Prepare monthly variance report
and comments on the various performance of certain project. December 1980 to April 1982 Project Assistant Engineer PHILIPPINE LONG DISTANCE TELEPHONE
CO. - MAKATI, PHILIPPINES §
Check
requirements, equipment, manpower through proper coordination and reflects
changes and revision if needed, Conduct job inspection of projects while
implementation is in progress to ensure accuracy of reports §
Prepare
construction schedule and translate to PERT/CPM time scaled network to ensure
that required logistics and supports for each projects such as plans
specifications and drawings, equipment, materials and manpower
were made available on time. §
Coordinate with Import and Supply
Department about the availability of materials for the project |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Tagalog |
Fluent |
|
|
|